Today's runc release landed. Our inventory had a cheerful little tick beside the build machine and absolutely no field for the systems that launch our test containers. I like a small diagram but I appear to have taken minimalism beyond the point of art.
Record the installed package and the distributor's fixed build on each runner class. The upstream release number alone will miss distro backports. If you can't say who owns a class, leave that line open.
We keep attestations for images. Those tell me about the thing we built. They don't tell me which runtime a different team uses when it launches the image. Adding the other team to the diagram cost me one arrow and two meetings.
In a tabletop I'd ask who can verify the runners that are powered off today. If the honest answer is nobody until they come back, give that job a name and a date.
Got the first machines back. Two were obsolete test nodes and have been retired with the owner present. The diagram now has an empty space which, for the first time in the history of this ticket, means what it looks like.